Editorial

The reforms our energy future demands

October 23, 2026
Antonio Gabriel La Viña
Project failures point to problems requiring policy attention. Contract surrenders point to barriers requiring reform. Each signal is an invitation to fix something.
The choice before government is clear. It can keep chasing politically convenient targets. Or it can fix the system holding everyone back

In my first installment, I examined the energy sector’s numbers. They revealed deep structural barriers facing developers. Today I turn to a case that shows governance failure.

That case involves Solar Para sa Bayan Corporation. Congress granted the company a legislative franchise. The franchise law gave the Department of Energy clear duties.

These are two explicit and unambiguous mandates. The word “shall” leaves no room for discretion. DOE was legally bound to act.

DOE did not fulfill either duty. It issued no implementing rules for the franchise. It determined no areas for the franchise to serve.

Years passed while the franchise sat frozen by inaction. The franchise holder could not lawfully operate without those rules. In fact, the franchise got automatically revoked after two years of mnon-operation,

Then, seven years later, DOE took action. It filed charges against the franchise holder. The alleged offense was failing to operate the franchise. DOE itself had made operation impossible.

Think carefully about what this sequence means. An agency neglects its legal obligation for seven years. Then it punishes another party for the consequences.

This is a textbook case of weaponized regulatory negligence. I call it regulatory abdication masquerading as enforcement.

The timing raises obvious questions about political convenience. The charges arrived exactly when politics made them useful. Investors notice patterns like this one.

The damage extends well beyond one company. Every franchise holder now wonders about its own exposure. Every foreign investor questions the reliability of our regulators. Credibility, once lost, takes years to rebuild.

I have worked with DOE officials for 30 years. Many are dedicated, competent, and technically excellent professionals. That history makes these failures deeply disappointing to me.

Supporting reckless, politically motivated accusations harms the institution itself. It erodes the trust built over decades. It distracts from the agency’s real mission. It signals that rules depend on political winds. No serious investor can plan around that uncertainty.

Government must instead read the signals the sector sends. Project failures point to problems requiring policy attention. Contract surrenders point to barriers requiring reform. Each signal is an invitation to fix something.

Investors compare countries before committing their capital. They weigh policy stability as heavily as returns. Regulatory surprises push them toward neighboring markets.

The Philippines cannot afford to lose that competition. Our renewable targets require massive private investment.

Public funds alone cannot build the capacity we need. Every departing investor takes potential megawatts with them. Every delayed project prolongs our dependence on imported fuel.

That is why governance quality matters so much. Rules must be clear before projects begin. Agencies must honor their own legal mandates. Enforcement must follow fairness and due process.

Administrative frameworks need modernizing for today’s market. Regulatory processes need simplifying and clear timelines.

Agencies need alignment so developers face one direction. Problem-solving should guide every interaction with industry. Suspicion should give way to constructive partnership.

Recent actions have done the opposite. They have introduced avoidable instability into the market. They risk slowing project timelines across the industry. They discourage the very investment our targets require.

Our country urgently needs additional generation capacity. It needs clearer permitting and stronger interagency coordination. Unverified claims and political narratives deliver none of this.

Responsible private participation remains indispensable to our power needs. Energy projects are long-term commitments spanning decades. They depend on predictable regulation and stable governance.

Legitimate businesses must operate free from undue harassment. The sector needs regulators who actively support infrastructure builders.

So where should government focus its energy?

First, it must fix transmission bottlenecks that strand power.

Second, it must cut permitting delays that kill projects.

Third, it must align policies across all agencies.

Fourth, it must pursue reforms through proposed EPIRA amendments. The Electric Power Industry Reform Act needs updating. Those amendments can address many longstanding sector problems.

Fifth, we must not backslide to building coal power plants again and cementing our reliance on natural gas.

These structural challenges truly affect consumers and investors. They shape electricity prices in every Filipino household. They determine whether investors commit capital here. They decide our long-term energy security.

Unfounded allegations solve none of them.

The choice before government is clear. It can keep chasing politically convenient targets. Or it can fix the system holding everyone back. Our energy future depends on choosing reform.

‍

‍

Originally published in Manila Standard on October 23, 2026.

Get In Touch

Connect with any of our dedicated lawyers to discuss how we can assist you.

Contact Us